PHASE ONE:
- Pot holing and utilities
- Surveying
- Demolition
- Street lane closures to allow for excavation of inside lane
- Sidewalk closure to allow for excavation of sidewalk
- Electrical and Conduit work
- Anchor bolt location
- Prep, placement and pouring of concrete for bus pad
- Prep, placement and pouring of concrete for elevated platform, ramps and sidewalks
- Curing and testing of concrete
PHASE TWO:
- Fabrication and installation of canopy structures
- Demolition and replacement of connecting sidewalks
- Landscaping
- Electrical and Communication work
- Pylon Installation
- Signage
AMENITIES PHASE:
- Installation of amenities
- Ticket Vending Machines
- Solar Compactor
- Bike racks
- Benches and Leaning Rails
- Public Artwork
- Testing of system and amenities
BASIC BRIO STOP
Pylon with basic amenities. Temporary stops are noted with a "T".
PROJECT IN DESIGN
Sun Metro is currently working with the Engineering and Construction Management Department to develop a strong construction plan to ensure the corridor is built efficiently and with the least amount of impact to our community.
COMING SOON
Sun Metro has completed the analysis of the project and has submitted the paperwork with the Federal Transit Administration to obtain federal funding.